Our work
Three projects, shown stage by stage in the order they were built. Each slideshow plays on its own. Pause it or use the arrows to look closer.
Site preparation
Factory project
Afram Plains
Heavy excavator working on the cleared plot
An industrial factory built from bare ground: site preparation, excavation and reinforced footings, structural steelwork, and a galvanised storage silo with elevated access.
Groundworks
Church project
Takoradi
Compound subgrade exposed along the retaining wall
A church building and its grounds: block and tile washrooms, a stone-clad entrance and spire tower, a main hall with suspended ceiling, fans and sound system, plus the boundary wall, paved forecourt, parking, sports court and landscaping.
Substructure
Mixed-use development
Cantonments
Deep excavation with a steel casing and formwork on rails
A mixed-use development in its structural phase: deep substructure, podium slab formwork and reinforcement, and column and wall starter bars rising for the levels above.
Have a project in mind?
Tell us what you want to build. We will come back with a clear plan and a cost.